Week 15
Mon:
The first coat of paint went on the ceiling and walls in the bathroom and dressing area, and the ceiling and wall in the powder room.




Tues: The concrete shower floor was poured.
The scallop siding on the side peak was caulked and given top coat of paint. The scallop siding on front dormer was installed, caulked and painted.
Wed: The electrician installed more switches and lights.


Trim was installed around the garage windows and doors.


Thurs: The closet and storage area doors were hung, and trim molding was started on all the new doors and windows.

Fri: trim around glass block window and diamond window.

The brick trim was added to the end of the porch.
The the radiant heat element and tile (for the bathroom) and wood flooring (for the closet/dressing room) arrived, and the exterior garage lights were installed.


Crush du Jour: Raul Olivo

3 comments:

Anonymous said...

Almost completed and it's looking good.

BTW, great nips on your crush!

Anonymous said...

It's looking great! I bet it feels so good to be getting things done!

Mistress Maddie said...

It is really starting to look great! Can't be long now till your complete is it? How long yet? And I noticed you got what looks to be a cutie painter in the picture. Was that for us?